Anyone Else working on the 35W bridge?

Collapse
X
 
  • Filter
  • Time
  • Show
Clear All
new posts
  • 93sc
    Panther Pilot
    • Feb 2003
    • 1585

    Anyone Else working on the 35W bridge?

    Just started down here on Friday. Just wondering if there is anyone else around here working down there. After tonight I should be over 40 hours so far, which isn't bad for 3 days.
    Originally posted by 68GTO
    I stand corrected. I was wrong.


    :geeza: Member of WCR inc.Member of Crown Vic PI / Marauder Mafia
  • HerrKooled
    TCS Homer
    • Nov 2005
    • 12060

    #2
    are you MNDOT?
    http://www.youtube.com/watch?v=FfpyB6AC9ak

    Comment

    • bluchev
      E.R.E.
      • Oct 2007
      • 12863

      #3
      what do you do? id love to be down there im an concrete pump operator.......unfortunately cemstone got the bid and is pumping all the concrete down there

      Comment

      • shays88tc
        2.3T POWER
        • Aug 2006
        • 325

        #4
        I used to work pretty much right under the bridge, until it fell on the tracks

        I wonder when the bridge will actually get done, and how well.


        Breathing new life, back in to me

        Comment

        • gixxer
          TCS Regular
          • Aug 2004
          • 1243

          #5
          I hope the civils who designed the new bridge used a bigger safety factor this time around.

          Comment

          • CorinthiansBlackGT
            TCS Homer
            • Mar 2004
            • 4235

            #6
            I was down there for about a month moving watermains outta the way of bridge footings..

            Good thing it wasnt the 10th ave bridge that fell... lol 48" watermain strung across that would of been a small river.

            Babies stay crunchy in milk!

            Comment

            • 93sc
              Panther Pilot
              • Feb 2003
              • 1585

              #7
              I'm a surveyor. Our company got brought in in the middle of the project because they were having prolem with the other company.
              Originally posted by 68GTO
              I stand corrected. I was wrong.


              :geeza: Member of WCR inc.Member of Crown Vic PI / Marauder Mafia

              Comment

              • 93sc
                Panther Pilot
                • Feb 2003
                • 1585

                #8
                Originally posted by shays88tc View Post
                I used to work pretty much right under the bridge, until it fell on the tracks

                I wonder when the bridge will actually get done, and how well.
                Judging by how hard they are pudhing around here I would say early and well.

                As far as design factors, from hat I have read down here so far, they are over building to a good amount.
                Originally posted by 68GTO
                I stand corrected. I was wrong.


                :geeza: Member of WCR inc.Member of Crown Vic PI / Marauder Mafia

                Comment

                • HerrKooled
                  TCS Homer
                  • Nov 2005
                  • 12060

                  #9
                  if everything goes right, the bridge should be done by dec 09.
                  http://www.youtube.com/watch?v=FfpyB6AC9ak

                  Comment

                  • Drunko McMoppo
                    Bloody Bill Brownlow
                    • Aug 2003
                    • 50752

                    #10
                    Originally posted by 93sc View Post
                    Judging by how hard they are pudhing around here I would say early and well.

                    As far as design factors, from hat I have read down here so far, they are over building to a good amount.
                    I'd prefer it be done halfassed so we can blame the next conservative transportation commissioner.
                    1998 Buick Lesabre Custom

                    Comment

                    • RayK
                      No mods............
                      • Feb 2004
                      • 6396

                      #11
                      Originally posted by HerrKooled View Post
                      if everything goes right, the bridge should be done by dec 09.
                      The other day in the news, they said the bridge should be done a couple of months early. Bonus money at work.
                      .

                      Comment

                      • Exjay
                        80085
                        • Jun 2005
                        • 6637

                        #12
                        well shit who want to come with me an dukes of hazzard over the bridge? i think i could make it if i get 2 bottles, the big ones
                        "On this episode of roadkill"

                        Comment

                        • bluchev
                          E.R.E.
                          • Oct 2007
                          • 12863

                          #13
                          they were only given a year to complete.....if not done huge penalty to follow

                          Comment

                          • Dustball
                            My title here
                            • Jan 2004
                            • 3251

                            #14
                            Originally posted by HerrKooled View Post
                            if everything goes right, the bridge should be done by dec 09.
                            DOT website says this year-

                            The new I-35W bridge over the Mississippi River in Minneapolis will open by Dec. 24th, 2008.
                            When we got to my place, I already had a candle burning. It was by "Glade", which I think you pronounce like the singer Sade, because it is an exotic candle that smells just like real pine.

                            Comment

                            • HerrKooled
                              TCS Homer
                              • Nov 2005
                              • 12060

                              #15
                              i meant to say 08
                              http://www.youtube.com/watch?v=FfpyB6AC9ak

                              Comment

                              Working...
                              X
                              😀
                              😂
                              🥰
                              😘
                              🤢
                              😎
                              😞
                              😡
                              👍
                              👎