Just started down here on Friday. Just wondering if there is anyone else around here working down there. After tonight I should be over 40 hours so far, which isn't bad for 3 days.
Anyone Else working on the 35W bridge?
Collapse
X
-
I'm a surveyor. Our company got brought in in the middle of the project because they were having prolem with the other company.Originally posted by 68GTOI stand corrected. I was wrong.
:geeza: Member of WCR inc.Member of Crown Vic PI / Marauder Mafia
Comment
-
-
Judging by how hard they are pudhing around here I would say early and well.Originally posted by shays88tc View PostI used to work pretty much right under the bridge, until it fell on the tracks
I wonder when the bridge will actually get done, and how well.
As far as design factors, from hat I have read down here so far, they are over building to a good amount.Originally posted by 68GTOI stand corrected. I was wrong.
:geeza: Member of WCR inc.Member of Crown Vic PI / Marauder Mafia
Comment
-
-
I'd prefer it be done halfassed so we can blame the next conservative transportation commissioner.Originally posted by 93sc View PostJudging by how hard they are pudhing around here I would say early and well.
As far as design factors, from hat I have read down here so far, they are over building to a good amount.1998 Buick Lesabre Custom
Comment
-
-
DOT website says this year-Originally posted by HerrKooled View Postif everything goes right, the bridge should be done by dec 09.
The new I-35W bridge over the Mississippi River in Minneapolis will open by Dec. 24th, 2008.When we got to my place, I already had a candle burning. It was by "Glade", which I think you pronounce like the singer Sade, because it is an exotic candle that smells just like real pine.
Comment
-




Comment